Installation WaLL MOUNTINg TEMpLaTE Extended centre line 1 5 5 (2 zero 0 ) The wall mounting template is located on the inner protective “A” – See Diagram in packaging. The template shows the place of the fixing and rear Frame 1 flue centre holes for a typical set up Care Should be taken to ensure the proper holes are drilled. Ensure all boss blanking plugs are removed before connecting hardware. Each valve should be fitted to the right boss as shown in the picture. SERVICING forty eight fuel Control VaLVE Replacement 1. Refer to border 40. 2. Unplug the electrical lead connection from the gasoline control valve. Permanent fault. Maximum protected temperature value reached, safety thermostat open-circuited, no circulation, sensor not or badly connected, dangerous connection or sensor fault. Page forty seven SERVICING 62 Ch WaTER pressure sENsOR Replacement 1. Refer to border 40. 2. Drain the boiler. Page 31 Installation 30 general ChECKs Make the next checks for right operation in: WaTER CIRCULaTION sysTEM 1. With the system Cold, verify that the preliminary strain is Domestic sizzling WaTER (DhW) MODE right to the system design requirements. 1. Fully open all DHW taps in turn and be sure that water flows For pre-pressurised methods, this must be 1.0 bar.
3. Recharge the tank pressure to 0.75 bar. If the pressure is seen to fall beneath the original installation strain of 1-2 bar over a time frame then a water leak may be indicated. Low boiler strain is usually nothing to panic about, but it can affect the effectivity of your central heating system and cause boiler issues. It could be clever to stop leaks as constantly filling the system may cause different problems. Below, Boiler problems and solutions PDF we will dive into these frequent boiler issues and provide tips about troubleshooting your heating system to get it back on monitor. BOILER REsTaRT procedure – To restart boiler, flip mode knob to restart place and immediately turn knob again to required setting. Installation 31 REsTaRT procedure To restart boiler, turn the mode management knob (D) to restart position and immediately flip knob again to required setting. Follow the on-screen instructions to scan the QR code and add Heat Link again to the app. Don’t subject any of the isolating valves to heat because the seals could also be broken. Fault Finding sixty eight aLTERNaTINg ‘L’ aND ‘1’ – Flow TEMpERaTURE OVERhEaT LOCKOUT Is the Boiler and CH System stuffed with water and all Fill and vent the system and open all isolation and radiator valves open?
SERVICING fifty four DRaININg ThE BOILER CH Circuit Inlet Return Flow Outlet Drain CENTRaL hEaTINg CIRCUIT 1. Refer to border 40. 2. Close all of the CH water isolating valves on the boiler inlet. Seek advice from Ignition Electrode Flame Detection Frame 50. 1. Remove ignition and flame detection electrodes. SERVICING 46 FLaME DETECTION ELECTRODE Replacement 1. Refer to frame 40. 2. Remove the burner. 4. Turn the siphon clockwise to disengage and elevate to take away. FE handling INTRODUCTION This boiler could require 2 or extra operatives to move it to its The i-mini range of boilers are wall mounted, full sequence, installation site, remove it from its packaging base and through automated spark ignition, low water content material, fanned flue, high motion into its set up location. Verify that the gasoline provide valve is fully open and that there are no points with the gasoline meter or provide line. SERVICING fifty six safety RELIEF VaLVE RENEWaL 1. Refer to frame 40. 2. Drain the boiler.
Page forty two SERVICING 50 CONDENsaTE Trap/sIphON Replacement 1. Refer to frame 40. Note: Ensure condensate entice is fully drained before removing. This allows the installation of deflector, excessive stage or balcony outlet flue kits without the removal of the entire ‘B’ pack terminal. Page 14 Installation UNpaCKINg The boiler is provided fully assembled in Pack A. A telescopic or non-telescopic flue meeting for rear or aspect flue outlet in Pack B is suppled as a separate order. Installation 19 assEMBLINg ThE ROOF FLUE Kit Determine the correct height that the flue should terminate above the roof. UppLy 3. Minimum acceptable spacing from the terminal to obstructions and ventilation openings are specified in Table 4. The native gas provider needs to be consulted, at the set up 4. Where the lowest a part of the terminal is fitted less than 2m planning stage, in order to determine the availability of an adequate (6’6”) above a balcony, above ground or above a flat roof supply of fuel. Installation 17 FITTINg ThE Optional ROOF FLUE Kit (Flat or pitched) Note. FETy LOCaTION OF BOILER Current fuel security (installation and use) laws or guidelines The boiler have to be put in on a flat and vertical inside wall, in power: capable of adequately supporting the weight of the boiler and any ancillary gear.
Should you have almost any concerns concerning where by and tips on how to make use of gas water heater not working pilot light off, it is possible to email us from the web page.
