Refer to frame 54. 3. Remove the clip on return thermistor. SERVICING 44 RETURN ThERMIsTOR RENEWaL 1. Refer to frame 40. 2. Unclip the return thermistor from the return pipe and withdraw it from the boiler. SERVICING 56 safety RELIEF VaLVE RENEWaL 1. Refer to border 40. 2. Drain the boiler. SERVICING 65 hEaT ENgINE RENEWaL Refer additionally to frame 5 – ‘Boiler Exploded View’ Important Before beginning the elimination procedure, protect the gasoline and electrical controls with a waterproof sheet or plastic bag. Refer to border 44. 4. Pull out and remove the clip (positioned behind the security valve) retaining the safety valve. 3. Hook the panel onto the top retaining clips. To prime it off, you could additionally damage the boiler and pipes if it’s not completed correctly. It’s vital to think about the place the plume might be launched as a result of it includes carbon and different gases which may be dangerous. But even Baxi boilers can go flawed sometimes. Page fifty two Fault Finding seventy three aLTERNaTINg ‘F’ aND ‘2’ – FLaME LOss Does the boiler ignite for a short Is the Gas Pressure accessible at Check gas supply and time after which extinguish?
Page 31 Installation 30 basic ChECKs Make the following checks for correct operation in: WaTER CIRCULaTION sysTEM 1. With the system Cold, check that the preliminary pressure is Domestic scorching WaTER (DhW) MODE right to the system design requirements. Installation 17 FITTINg ThE Optional ROOF FLUE Kit (Flat or pitched) Note. Page 15 Installation UNpaCKINg CONT’D Note. SERVICING 52 User Control pCB Replacement Note. Installation 31 REsTaRT procedure To restart boiler, turn the mode control knob (D) to restart place and instantly flip knob back to required setting. FE handling INTRODUCTION This boiler could require 2 or more operatives to maneuver it to its The i-mini vary of boilers are wall mounted, full sequence, set up site, remove it from its packaging base and through automated spark ignition, low water content, fanned flue, excessive motion into its installation location. Please use the knowledge in the desk as a rough guide solely, and at all times ask a Gas Safe registered engineer for a extra exact recommendation earlier than buying a new combi boiler. If the code persists, it could point out a extra vital drawback, and it is best to consider purchasing a new boiler.
If the issue is with the burner, this may generate a different fault code. Permanent Fault – On board CSU time-out. Another trigger may very well be a failure throughout the printed circuit board or PCB. SERVICING fifty four DRaININg ThE BOILER CH Circuit Inlet Return Flow Outlet Drain CENTRaL hEaTINg CIRCUIT 1. Refer to frame 40. 2. Close all of the CH water isolating valves on the boiler inlet. E.01 – .02Permanent Fault – Temperature measured by return sensor larger than stream sensor. Temperature sensing: The thermistor is used to measure the temperature of the water within the combi boiler, and to manage the heating parts accordingly. Fault Finding sixty eight aLTERNaTINg ‘L’ aND ‘1’ – Flow TEMpERaTURE OVERhEaT LOCKOUT Is the Boiler and CH System full of water and all Fill and vent the system and open all isolation and radiator valves open? Usually, all you might want to do is bleed the radiators in your house utilizing a radiator key to launch among the strain. Have you ever thought of fitting radiator thermostats and solely heating the room/s that you utilize during the day? You need to act quick.
In the event that they have no energy, there’s either a general energy minimize or your shopper unit (fuse field) has tripped. The strategy they would use would be a energy flush, the place chemicals are pumped by way of your pipes to clear all of the sludge and blockage. The strategy of filling, refilling, topping up or flushing sealed Vessel charge pressure 0.5 to 0.75 primary scorching water circuits from the mains through a short lived hose system pre-cost strain bar None connection is just allowed if acceptable to the native water authority. SERVICING sixty six Expansion VEssEL REChaRgINg & Replacement Recharge Point REChaRgINg 1. Refer to frame 40. 2. Remove the cost point cover. Check with Ignition Electrode Flame Detection Frame 50. 1. Remove ignition and flame detection electrodes. SERVICING forty six FLaME DETECTION ELECTRODE Replacement 1. Refer to border 40. 2. Remove the burner. Refer to frame 43. 3. Unplug the flame detection lead from the electrode. SERVICING forty eight gas Control VaLVE Replacement 1. Refer to border 40. 2. Unplug the electrical lead connection from the fuel control valve.
